单项选择题
A.locate the Tivoli Storage Manager data set for the server at the DR site, do a full backup, recover the data to the DS6800, and make the data availableto the server
B.create RMC relationships for all of the data on the server to the DS6800, shut down the server, and make the data available to the new server
C.shut down the server,create RMC relationships for all of the data on the server to the DS6800, and make the data available to the new server
D.recover the TSM backups to the DS6800 at the remote site, and make the data available to the new server
单项选择题 A customer is planning a combined solution of a 2 node SVC and DS8700 with 128x300 GB FC disks. During the TDA the reviewer compares the machine configuration with the customer’s expectations. Which of the following customer requirements must be considered()
单项选择题 A company with three sites (one local production site, one intermediate site, and one remote site) wants to use Metro/Global Mirror. Which statement is correct about the volumes at the intermediate site()
单项选择题 Whatmustbespecifiedtocreateanextentpool()