单项选择题
A.proper combustion
B.water in the fuel
C.excess air
D.cold fuel oil
单项选择题 In readying an auxiliary water-tube boiler for a routine hydrostatic test, which of the following procedures should be undertaken prior to filling the boiler with fresh water?()
单项选择题 () should be tested and adjusted when the boiler survey is carried out.
单项选择题 Foaming in the steam drum may be caused by () in a boiler.