单项选择题
A.quantity of fuel to be received
B.flash point of the fuel as it is received
C.fuel temperature as it is received
D.viscosity of the fuel being received
单项选择题 If the overflow tank high-level alarm sounds while the fuel oil tanks are being topped off, the engineer should ().
单项选择题 After fuel tanks have been topped off, which of the listed procedures should be followed next?()
单项选择题 The most critical part of the bunkering operations, which can result in an oil spill, is when the ()