black

IBM(000-102)

登录

单项选择题

An application running on a production cluster failed over to the backup node, however, the DLPARintegration scripts failed.

On inspection, it was discovered that the scripts failed as a result of /var being 100% full. The administratoradded more space to /var and ran the following command:
Which of the following is the correct next action?()

A.Refresh the RMC daemon using rmcctrl
B.Refresh the RSCT subsystem using SRC
C.Recover from script failure using clruncmd
D.Reconfigure the RSCT subsystem using recfgct

相关考题

单项选择题 Acustomerisintheprocessoftestingtheirconfigurationpriortogoinglive.TheadministratordiscoversthatPowerHAistaking31secondstodealwithastandardNICfailure.WhatcantheadministratordotospeeduptheprocessofNICfailuredetectionanddiagnosis?()

单项选择题 Whentuninganetworkmodulewhatisthepurposeofthegraceperiod?()

单项选择题 An administrator was notified that a resource group has failed over from the home node, Node1 to a standbynode, Node2 and that Node1 had been powered off. Upon restarting Node1 the administrator checked the AIXerror log and the cluster.log Which of the following is most likely the cause of the failover?()

All Rights Reserved 版权所有©PP题库网库(pptiku.com)

备案号:湘ICP备14005140号-5

经营许可证号:湘B2-20140064