单项选择题
A.Use the Advanced Systems Management Interface to enter the Capacity on Demand Enablement code.
B.Use the Web-based System Manager Interface to enter the Capacity on Demand enablement code.
C.Use smitty or smit interface to enter the Capacity on Demand enablement code.
D.Use oem_setup_env on the Virtual I/O Server to enter the Capacity on Demand enablement code.
单项选择题 Company.com has an EMC disk array and would like to connect it to a Virtual I/O Server on a pSeries p5-520. How can the EMC device drivers be installed?()
单项选择题 Company.com has recently added a partition to an existing p5-550 4-way with 8GB RAM. When the newly-created third partition is started, it fails to initialize. The configuration of the partitions is as follows: LPAR Min CPU Des CPU Max CPU P1 0.8 1.4 2.0 P2 0.8 1.4 2.0 P3 1.4 1.6 2.0 Which of the following actions will most likely resolve the problem?()
单项选择题 A user has an application server LPAR with a physical Ethernet adapter. They want to have a database LPAR also connected to the application LPAR via virtual Ethernet. Their security policies require a firewall between the application LPAR and database LPAR. Which of the following virtual Ethernet configurations satisfies the customer’s requirements?()