单项选择题
A.the production environment does not require an outage
B.the production environment requires an outage to install the SVC
C.the production environment requires an outage to install the DS8700
D.the production environment requires an outage to remove the EMC systems
单项选择题 mainframe customer would like to receive a proposal for a mainframe storage system with 120 TB raw capacity. The mainframe server load is not too high, and they need hard disk drives with the lowest possible power consumption to keep operating costs low. The customer will not increase the capacity of their mainframe applications in the future but rather invest later into their System p servers. Which of the following solutions best meets these requirements at the lowest cost()
单项选择题 A bank has requested proposals for a storage solution to upgrade their disaster recovery processes for their IBM System z, UNIX, and Microsoft Windows environment. The solution must simulate a multi-site environment and provide the customer the ability to evaluate Metro Mirror, Global Mirror, Global Mirror for z/OS, and FlashCopy. 120 TB physical capacity is required per site. Only Fibre Channel drives can be used. Which solution best meets the specified requirements()
单项选择题 A customer has an IBM System Storage DS8700 and wants to reach the highest possible throughput in the back-end for a storage-pool-striped volume out of an extent pool with 8 ranks. Over how many device adapter pairs should a technical specialist spread the workload()