Refer to the exhibit. VLAN2, VLAN3, and VLAN10 are configured on the switch D-SW1. Host  computers are on VLAN 2 (10.1.2.0), servers are on VLAN 3 (10.1.3.0), and the management  VLAN is on VLAN10 (10.1.10.0). Hosts are able to ping each other but are unable to reach the  servers. On the basis of the exhibited output, 
which configuration solution could rectify the  problem?()

    A. Assign an IP address of 10.1.3.1/24 to VLAN3.
    B. Configure default gateways to IP address 10.1.10.1 on each host.
    C. Enable IP routing on the switch D-SW1.
    D. Configure a default route that points toward network 200.1.1.0/24.
    E. Configure default gateways to IP address 10.1.2.1 on each host.
    F. Configure default gateways to IP address 200.1.1.2 on each host.