单项选择题
A pSeries technical specialist is performing a solutions assurance with a customer for a new single-frame 10-node p655 system being attached to a currently installed HMC. Which of the following questions should be asked to gather all the required information to determine whether the p655 solution can connect to the HMC?()
A.Are there at least ten RS-232 ports available on the HMC?
B.Are there at least ten RS-422 ports available on the HMC?
C.Are there at least ten RS-232 and two RS-422 ports available on the HMC?
D.Are there at least two RS-232 and ten RS-422 ports available on the HMC?
相关考题
-
单项选择题
Acustomerhasrequestedthemostcost-effectivep5solutionallowingforgrowth.WhichofthefollowingshouldthepSeriestechnicalspecialistconsiderdoingwhenconfiguringeachp5systemusingeConfig?()
A.Implementing CoD
B.Using Express Configurations with processor upgrades
C.Meeting the minimum Value Pak rules
D.Engaging the pSeries representative to identify appropriate discounts -
单项选择题
AcustomerhasanexistingSPsystemandneedstoaddcardstosomeofthenodes.Whichofthefollowingapplicationsmustbeusedtoconfiguretheupgrade?()
A.MRPDPlus tool
B.Inventory Services
C.PCRS6000 Portable Configurator
D.eConfig - IBM Configurator for e-Business -
单项选择题
Upon announcement,the specific details surrounding the Virtual I/O Server requirements and performance are still being defined. The customer has engaged IBM to provide a server consolidation solution and would like to take advantage of the VIO Server benefits. How should the pSeries technical specialist best address this?()
A.Design the solution and present it confidently so the customer does not question it.
B.Design the solution and ensure the customer understands the unknowns with the new technology.
C.Explain to the customer that the VIO Server does not benefit them when doing server consolidation so it has not been configured.
D.Explain to the customer that the details surrounding the VIO Server have not been clearly defined so designing a solution is premature.
