单项选择题
The navigational term set of current means().
A.velocity of current in knots
B.direction from which the current folws
C.estima ed current
D.direction toward which the current flows
点击查看答案&解析
相关考题
-
单项选择题
The port clearance for a ship should be granted()the completion of loading or discharging in the port.
A.before
B.when
C.after
D.during -
单项选择题
The port gang way caught on a()on the wharf and was severely damaged.
A.bollard
B.bitt
C.stem
D.keel -
单项选择题
The present voyage of my ship began at the port of Shanghai after loading 8000 tons of cargo on board and ended after discharging the cargo at the port of Hong Kong, which is().
A.the port of destination
B.the next port of call
C.the port of arrival
D.the last port of call
