单项选择题
An administrator is creating a redundant environment for a current data center. A backup site must be available if the entire data center site should become unavailable. To reduce costs, this backup site does not need to be up and running at all times ready for failover. It must contain equipment and the ability to restore data from the data center.
Which of the following site types should be considered to meet these requirements? ()
A. Hot site
B. Warm site
C. Cold site
D. Active failover site
相关考题
-
单项选择题
Which of the following is the MOST important physical consideration when deploying a new server?()
A. Humidity monitors, Biometrics, and fire suppression
B. Cooling, rack space, and power requirements
C. Service level agreements, uninterruptible power supply (UPS) deployment, and CCTV
D. Biometrics, fire suppression, and power requirements -
单项选择题
Whileconsideringsecurity,whichofthefollowingistheBESTplaceforapublicwebserver accessibleviatheInternet?()
A. Internal network
B. VLAN
C. VPN
D. DMZ -
单项选择题
Which of the following expansion cards should be installed into a server to provide iSCSI SANconnectivity?()
A. HBA
B. PBX
C. VoIP
D. NIC