单项选择题
An AIX 5.3 customer has a Power 780 in a 2-meter (T42) rack. This rack needs to be moved six inches (15cm) to allow under-floor access.
What preparation for moving the rack will result in the least disruption to end-users?()
A.Initiate LPAR fallover to backup systems.
B.Use Live Partition Mobility to move the LPARs to other systems.
C.Use Live Application Mobility to move critical applications to alternate systems.
D.Back up all LPARS to a NIM server and restore them to other LPARs on other systems.
相关考题
-
单项选择题
A Power 720 has AIX 6.1 and Linux partitions.During normal workloads there is more than enough memory available to the LPARs. During month-end processing one partition becomes memory constrained. What can help overcome this situation?()
A.Active Memory Sharing (AMS)
B.Active Memory Expansion (AME)
C.Integrated Virtual Memory (IVM)
D.Memory Capacity on Demand (CoD) -
单项选择题
A customer would like to consolidate multiple database workloads to a single server to reduce TCO. What is the effect of PowerVM on TCO?()
A.Reduces SAN cost
B.Reduces network cost
C.Reduces administration costs
D.Reduces software licensing cost -
单项选择题
A customer has a requirement to eliminate single points of failure for an application. They have allocated one Ethernet adapter to each VIO server on the system. Which features of PowerVM and AIX will support the customer requirement?()
A.Etherchannel and trunking
B.Network Interface Backup and Etherchannel
C.Shared Ethernet Adapter (SEA) Failover and Etherchannel
D.Network Interface Backup and Shared Ethernet Adapter failover
