单项选择题
A customer is ordering a new p650 server to be placed into an existing OEM 42U 19-inch rack containing only two p630 servers. This is the first p650 in the enterprise. What is the most important question that the pSeries technical specialist should ask the customer before the order is placed?()
A.Have the PDU requirements been met?
B.Are there sufficient KVM connections?
C.Is there sufficient service clearance?
D.Is there sufficient space in the existing rack?
相关考题
-
单项选择题
ApSeriestechnicalspecialistisconfiguringthenetworkadaptersforanHACMPcluster.Theplanistouseafour-portEthernetadapterwithIPATviaIPaliasingforthetwoserviceIPlabels.Whichofthefollowingwouldbeacriticalconcernwiththeproposedconfiguration?()
A.A four-port adapter is not supported.
B.The four-port adapter is a single point of failure.
C.There should be a spare port for each service IP label.
D.The four-port adapter could be a potential performance bottleneck. -
单项选择题
Acustomerneedsbothadatabaseandapplicationservertocommunicateoveranetwork.ThenewsystemswillbeconnectedtothesamenetworkasthecurrentIBMequipmentwithknownIBMserialnumbers.HowcouldapSeriestechnicalspecialistbestdeterminewhichtypeofnetworkcardisappropriate,withoutmakinganadditionalcalltothecustomer?()
A.Use an Inventory Services retrieval to show adapter features.
B.Retrieve previous eConfig proposals to see what others had shown.
C.Call the Account Executive to ask what the customer has used in the past.
D.Query the Supportline problem record database for the customer and LAN keyword matches. -
单项选择题
AcustomerwantsaconfigurationforanewsystemthatincludesReserveCoD.Whichofthefollowingsystemswouldbethemostappropriatetoconfigureforthem?()
A.p5-550
B.p5-520
C.pSeries p650
D.pSeries p630
