单项选择题
An administrator will be performing a PowerHA upgrade on a cluster from version 5.3 to version 5.5. Which ofthe following tasks will verify a successful migration?()
A.Use the clstat command and verify the cluster is in a stable state
B.After each node is upgraded, run a verification and synchronization
C.After all nodes are upgraded, run a verification and synchronization
D.Take a snapshot of each node and verify the configuration is the same
相关考题
-
单项选择题
AcustomerwantstomigratetheirexistingclusterontonewPOWER6hardware,andinadditionrequirestheclustertobemigratedfromPowerHAversion5.3to5.5.GiventhatAIX6.1andPowerHA5.5filesetsarealreadyinstalledinthenewhardware,whichofthefollowingmethodswouldallowthecustomertomaintaintheircurrentclusterconfiguration?()
A.Add the new nodes to the existing cluster, and perform a rolling migration and remove the original nodesfrom the cluster
B.Add the new nodes to the existing cluster, and perform a non-disruptive upgrade and remove the originalnodes from the cluster.
C.Create a snapshot of the existing cluster and apply the snapshot to the new cluster. Start cluster serviceson the new cluster and stop the original cluster
D.Create a snapshot of the existing cluster and apply the snapshot to the new cluster. Stop cluster serviceson the original cluster and start on the new cluster -
单项选择题
Anadministratorhasalegacyclusterrunningversion4.5/ESandwouldliketoupdatetoversion5.5.Whichofthefollowingisavalidupgradepath?()
A.1. Upgrade from 4.5 to 5.12. Upgrade from 5.1 to 5.5
B.1. Upgrade from 4.5 to 5.22. Upgrade from 5.2 to 5.5
C.1. Upgrade from 4.5 to 5.32. Upgrade from 5.3 to 5.5
D.1. Upgrade from 4.5 to 5.4.12. Upgrade from 5.4.1 to 5.5 -
单项选择题
A customer wants to configure two resource groups and create the following shared filesystem structure:Resource GroupFilsystem Mount Point Rg1/app1 Rg2/app1/data Which of the following will ensure the proper mount order for these filesystems?()
A.Set filesystem recovery method to parallel
B.Set filesystem recovery method to sequential
C.Set filesystem recovery method to parallel and configure a parent/child relationship for the resourcegroups
D.Set filesystem recovery method to sequential and configure a parent/child relationship for the resourcegroups
