单项选择题

You have just created a new VLAN on your network for inter-VLAN routing.  
What is one step that you should include in your VLAN-based implementation and verification plan?()

    A.Verify that different native VLANs exist between two switches for security purposes.
    B.Verify that the switch is configured to allow for trunking on the switch ports.
    C.Verify that each switch port has the proper IP address space assigned to it for the new VLAN. 
    D.Verify that the VLAN virtual interface has been correctly created and enabled.