单项选择题
Which additional application must be installed in order to use WebSMIT?()
A.Mozilla for AIX
B.An Apache compliant Web server
C.Web Based System Manager (WebSM)
D.Websphere Application Server Community Edition
相关考题
-
单项选择题
Inaclusterusing/etc/hostsfornameresolution,whichofthefollowingdescribestheminimumrequirementsforthe/etc/hostsfile?()
A.IP address and IP label of each service and boot interface in the cluster
B.IP address and IP label of each service and boot interface in the cluster, loopback interface, and the hostname of the node
C.IP address and IP label of each service and boot interface in the cluster, the loopbackinterface, and the cluster gateway
D.IP address and IP label of each service and boot interface in the cluster, the loopbackinterface, the cluster gateway, and the subnet network addresses -
单项选择题
AnorganizationcurrentlyusesVeritasVolumeManager(VxVM)andisintegratingPowerHA.WhichofthefollowingdescribeshowPowerHAsupportsVeritasvolumegroups?()
A.PowerHA only manages VxVM volume groups by using customized pre- and post-event scripts
B.PowerHA is tightly coupled with AIX LVM. All volumes groups must be converted to AIX LVM
C.PowerHA supports VxVM as an OEM volume group type. PowerHA manages the volume group with a limited suite of management tasks
D.PowerHA supports VxVM as an OEM volume group type. All cluster operations applicable with AIX LVM are also applicable with VxVM -
单项选择题
An administrator is planning a two node cluster containing Node1 and Node2 with a single resource groupnamed RG1. RG1 startup policy will be ’Online on Home Node only’. The home node is Node1. If RG1 fails over to Node2 itmust fall back to Node1. Fall back must take place outside of business hours. The agreed time for fall back is20:00. How will this be achieved with minimum action taken by administrator?()
A.Configure the resource group with a fallback policy of "Fallback to Higher Priority Node" Restart Node1 at20:00
B.Configure the resource group with a fallback policy of "Never Fallback" Manually move the resource groupfrom Node2 to Node1 at 20:00
C.Configure the resource group with a fallback policy of "Fallback To Higher Priority Node" Create a"Delayed Fallback Timer" policy to meet the requirements Allocate this delayed timer policy to theresource group RG1
D.Configure the resource group with a fallback policy of "Never Fallback" Create a "Delayed Fallback Timer"policy to meet the requirement Specify this delayed timer policy as a "Fallback Override" to the resourcegroup RG1
