单项选择题
Companycom has several CR3 HMCs managing their p690 servers. They have purchased a new p5 570 and would like to manage the new system with an existing HMC.
What is required to support this environment?()
A.Free up one HMC and update the software for use with the p5 570
B.Connect the new p5 570 server to an existing HMC and manage the p690s and p5 570 from that HMC
C.Order a new HMC to support the new p5 570 server since the CR3 HMC is not supported for a p5 570
D.Backup the HMC to DVD-RAM and select HMC migrate to move all the profile data to the new HMC software
相关考题
-
单项选择题
System configurations on the HMC have been backed up correctly. After a restore, the partitions are defined with different characteristics than the running systems. What is the most probable cause of this problem?()
A.The LPAR Configuration backup is corrupt
B.The LPAR Configuration has been altered using DLPAR
C.The LPAR Configuration backup was performed on a different HMC
D.The LPAR Configuration has been altered through the Advanced System Management Interface (ASMI) on the server after the backup was performed -
单项选择题
The System Administrator has set up shared processors on three partitions in the p5 590 system. The shared processors have been set to uncapped. The system administrator notices that the logical partition is acting like it is capped. What is the most probable cause?()
A.The uncapped weight has been set to 0.
B.The uncapped weight has been set to 128.
C.The processing unit for that partition was set to .1 processing units. A full processor was assigned.
D.The processing unit for that partition was set to 0.50 processing units. A full processor was assigned. -
单项选择题
AclienthastheneedtorebootoneoftheirVirtualIOServers.Whatcommand(s)wouldberuntolisttheclientsthataredependantonVirtualIOServerdiskandnetworkresources?()
A.lsmap -all -net
B.lsclient -disk -net
C.lsdev -virtual -client
D.lsmap -all; lsmap -net
