单项选择题
Company.com is adding a new I/O drawer to an existing p5-570 with four LPARs and wants to re-balance the network cards in the I/O drawers.
What is the best way to accomplish this?()
A.Add the devices as virtual adapters to a VIO server first,then add the I/O drawer and create the shared ethernet adapters
B.Power down the partitions,run the diag a command when the system is brought back up and reconfigure the network cards
C.Use the rmdev command to remove the devices,shut down the partitions and move the cads,then run the cfgmgr command after reboot
D.Detach the network cards,run rmdev on the devices and then dynamically reassign theadapters to the partitions and reconfigure
相关考题
-
单项选择题
Company.com with limited AIX skills has purchased a p5-520 2-way which will run Micro-Partitions. To reduce the initial cost of purchase, the customer will be sharing the system resources using a VIO server. The customer is concerned about managing the installation of the operating system. Which of the following should the customer perform?()
A.Use alt_disk_install to install AIX on all logical partitions.
B.Configure the DVD as a desired resource on all partitions.
C.Configure all resources as shared resources between all partitions.
D.Create a separate NIM server to manage the installation of all partitions. -
单项选择题
Company.com has four pSeries servers in their data center and wants to deploy multiple Micro-Partitions. Which of the following data center servers can be used for this purpose?()
A.p5-520 running Virtual I/O Server
B.p690 running AIX 5L V5.3
C.p5-510 running AIX 5L V5.2
D.p5-520 running two dedicated processor partitions -
单项选择题
The database on a p5-570 Micro-Partition has grown and backups are not meeting the Service Level Agreement. There are several partitions using the Virtual I/O Server to access the storage array. The database backup has high CPU utilization while the others have low CPU utilization. What adjustment can the technical specialist make to ensure that the Service Level Agreement is achieved?()
A.Add memory to the database partition to improve response time.
B.Add additional Host Bus Adapters to the server to improve IO throughput.
C.Modify CPU allocations to favor the database partition.
D.Increase CPU allocations to the Virtual I/O Server.