单项选择题
When the ship, its main propulsion device equipped with clutch, arrived at the port and finished with the engine, the correct operation should be()
A.disengaging the clutch firstly, then stopping the main engine
B.stopping the main engine firstly, then disengaging the clutch
C.stopping the cooling water pump firstly, then stopping the main engine
D.stopping the main engine and disengaging the clutch at the same time
点击查看答案&解析
相关考题
-
单项选择题
During the watch keeping at sea, the engineer in charge should notify in the event of any serious occurrence or a situation where he is unsure of the action to take()
A.the master
B.the chief engineer
C.the bridge
D.the company superintendent -
单项选择题
Before engaging the turning gear and turning the diesel engine, which of the following operation should be done except()
A.open the indicator cocks
B.supply some CYL Oil to cylinder liner wall with lubricator (only for two stoke diesel engine)
C.put the fuel handle in the “stop” position
D.pump up the air bottle -
单项选择题
The seven segment arrangement for numerical(数字的) display on consoles, test meters and other applications can be either()
A.UJT or BJT
B.BCD or OCD
C.JFET or IGFET
D.LED or LCD
