单项选择题
After rebuilding the list of virtual devices used by the VIO server using the "cfgdev" command, which command would be run to verify that a newly configured virtual SCSI adapter is available?()
A.lsdev -virtual
B.lsdev -Cs scsi
C.lscfg -vl
D.lsdev -adapter
相关考题
-
单项选择题
Company.com has recently received a new p5-570 in the data center and intends to Micro-Partition the server. In which order should installation steps be taken?()
A.Connect to the network,power on the server,Micro-Partition the server
B.Connect to the HMC,power on the server,Micro-Partition the server,connect to the network
C.Power on server,connect to the network,Micro-Partition the server,connect to the HMC
D.Power on the server,connect to the HMC,Micro-Partition the server,connect to the network -
单项选择题
A technical specialist has a requirement to implement a 4-way POWER5 server with a small Web server partition and a high performance database server partition. The Web server provides a client front-end to the database server. The most important concerns are speed of communication between the Web server and the database and I/O speed of the database. Which of the following virtualization features would be most appropriate?()
A.Virtual SCSI
B.Virtual Ethernet
C.Virtual I/O Server
D.Micro-Partitioning -
单项选择题
Company.com is running a p5-550 system with inactive processors. The system is managed using the Integrated Virtualization Manager. How would the system administrator activate two additional processors?()
A.Use the Advanced Systems Management Interface to enter the Capacity on Demand Enablement code.
B.Use the Web-based System Manager Interface to enter the Capacity on Demand enablement code.
C.Use smitty or smit interface to enter the Capacity on Demand enablement code.
D.Use oem_setup_env on the Virtual I/O Server to enter the Capacity on Demand enablement code.