单项选择题
A customer is planning a combined solution of a 2 node SVC and DS8700 with 128x300 GB FC disks. During the TDA the reviewer compares the machine configuration with the customer’s expectations.
Which of the following customer requirements must be considered()
A.the number of SAN ports required by the solution
B.thin provisioning is mandatory
C.the solution needs to support RAID 0
D.the solution needs to be supported by the VMware Site Recovery Manager
相关考题
-
单项选择题
A company with three sites (one local production site, one intermediate site, and one remote site) wants to use Metro/Global Mirror. Which statement is correct about the volumes at the intermediate site()
A.the intermediate site volumes are Metro Mirror target volumes for the remote site
B.the intermediate site volumes are Global Mirror target volumes for the remote site
C.the intermediate site volumes are both Global Mirror source and Metro Mirror target at the same time
D.the intermediate site volumes are alsoFlashCopy sources for the remote site -
单项选择题
Whatmustbespecifiedtocreateanextentpool()
A.blocksize, rank group, and name
B.storage type, rank group, and name
C.storage type, capacity, and rank group
D.capacity, name, and storage type -
单项选择题
A Business Partner is proposing the installation an IBM XIV Storage System at a customer location. What is the best time to discuss floor space requirements for the solution()
A.during the Technical Delivery and Assessment
B.during installation of the equipment
C.prior to delivery of the XIV
D.during the solution proposal
