单项选择题
The Information Technology (IT) department wants to consolidate two 4-way p5-550 servers onto an 8-way p5-570. However, the departments using the p5-550 servers are concerned about quality of service after consolidation.
Which per-partition processor allocation would provide comparable performance while still allowing the POWER5 hypervisor to optimize the processing workload of the server?()
A.4.0 processing units, 4 virtual processors, capped mode
B.4.0 processing units, 4 virtual processors, uncapped mode
C.4.0 processing units, 8 virtual processors, capped mode
D.4.0 processing units, 8 virtual processors, uncapped mode
相关考题
-
单项选择题
Company.com has recently received a new p5-570 in the data center and wants to Micro-Partition the server. The customer already has an existing HMC connected to a p690. Which of the following actions should the technical specialist take?()
A.Order a POWER5 HMC
B.Connect to the existing HMC
C.Install an 8-port asynchronous card in the managed server to connect to the existing HMC
D.Install an additional network card to the existing HMC and connect to the POWER5 service processor -
单项选择题
A system administrator has a pSeries p5-520 2-way with AIX 5L V5.2 with a peak utilization of 50%. There is a request to add a new Web server for a small department. Which of the following solutions is the best fit for this environment?()
A.Create a dedicated LPAR for the existing workload and a Micro-Partition for the Web server.
B.Create a dedicated LPAR for the existing workload and a dedicated LPAR for the Web server.
C.Create a Micro-Partition for the existing workload and a dedicated LPAR for the Web server.
D.Create a Micro-Partition for the existing workload and a Micro-Partition for the Web server. -
单项选择题
Company.com has ordered an 8-way p5-570 and plans to deploy four AIX 5L v5.3 LPARs. The pre-installation system design has all eight processors being placed in the shared processor pool, and four Micro-Partitions being assigned resources from the pool. Prior to the implementation of the system, the customer informs the technical specialist that one of the applications is only supported on AIX 5L 5.2. Which of the following changes to the system design should the technical specialist make to accommodate this change?()
A.Create all the partitions as AIX 5.2, each having two dedicated processors.
B.Purchase a system with two additional processors that can be assigned to the AIX 5.2 Partition.
C.Specify an AIX 5.2 partition using dedicated processors, reducing the number of processors in the shared pool.
D.Use the virtual I/O server to manage the disks and network connections removing the need for different levels of device drivers.