单项选择题
The account team is putting together a very complex solution for the customer. During the solution design phase, many of the customer’s requirements have changed and additional requirements are being identified. What should the pSeries technical specialist do to ensure the greatest possible customer satisfaction?()
A.Use eConfig to configure and validate each pSeries and p5 system.
B.Engage Advanced Technical Support to review any outstanding technical issues.
C.Confirm with the customer that the solution design meets their requirements.
D.Perform a Pre-Install Solution Assurance Review to validate required power requirements.
相关考题
-
单项选择题
AcustomerplanstoorderseveralnewpSeriessystemsandisconcernedthattheadditionalheatloadmayoverwhelmthecurrentair-handlingsystem.HowmightthepSeriestechnicalspecialistaidthecustomerinaddressingtheirconcern?()
A.Direct the customer to the Installation Guide for each system to identify the power requirements.
B.Direct the customer to engage their site personnel to ensure the proper power connectors are provided to support the systems.
C.Direct the customer to the Site and Hardware Planning Information and review the system requirements for each new pSeries system.
D.Direct the customer to the Site and Hardware Planning Information to confirm that enough space is available in the rack to allow for proper airflow. -
单项选择题
AcustomercurrentlyhasfivepartitionedPOWER4systemsandisaddingnewsystems.WhenthepSeriestechnicalspecialistintroducesthefirstp5systemwithCoDintothisenvironment,howshouldtheHMCbehandled?()
A、Order a new HMC to support the p5 system.
B、Attach the new p5 system to the existing HMC.
C、Upgrade the existing HMC to accommodate both the POWER4 and p5 systems.
D、Do nothing. This system does not require an HMC. -
单项选择题
ApSeriestechnicalspecialisthasbeenaskedtoprovideaserverconsolidationsolutiontoreplaceseveralAIXserversrunningtypicalcommercialdatabaseworkloads.BenchmarksforSPECint,SPECfp,SPECjbbaswellasestimatesofROLTPandrPerfareavailableforallthecurrentsystems.Whichofthefollowingcouldbeusedasafirstapproximationoftotalperformancerequiredforonelargeserver?()
A.Sum of SPECfp values
B.Sum of rPerf values only
C.Sum of rPerf and ROLTP values
D.Sum of SPECint and SPECjbb values