单项选择题
In project management , a (73) is a listing of a project’s milestones, activities, and deliverables, usually with intended start and finish dates. Those items are often estimated in terms of resource (74) ,budget and duration, linked by dependencies and scheduled events.
A. schedule
B. activity
C. plan
D. contractor
点击查看答案&解析
相关考题
-
单项选择题
Circuit-switching technology is used in Publish Switched Telephone Network(PSTN), Global System for Mobile Communications(GSM) and code Division Multiple Access (CMDA) . It is a ( ) information transfer mode.
A. connection oriented
B. connectionless
C. high bandwidth utilization
D.poor real-time -
单项选择题
Information theory is related to the quantification of information. This was developed by Claude E. Shannon to who found fundamental limits on ( ) operations such as compressing data and on reliably storing and communicating data.
A. signal
B. data
C. information
D. signal processing -
单项选择题
某项目的项目经理在进行项目范围变更时,在对项目的技术和管理文件做了必要的修改后,他下一步应该()。
A、及时通知项目干系人
B、修改公司的知识管理系统
C、获取客户的正式认可
D、获得政府认可