单项选择题
A customer has many RS/6000s and POWER4 systems running different AIX applications. What should the customer do to best position themselves for the migration to POWER5?()
A.Upgrade OS to AIX 5.2.
B.Implement Micro-Partitioning.
C.Upgrade HMC to support POWER5.
D.Install Partition Load Manager.
点击查看答案
相关考题
-
单项选择题
A customer wants to run eight production partitions each with the following: ? 0.7 CPU 1.65-GHz ? 4GB of RAM ? 2 Ethernet adapters They do not have room for many RIO drawers since rack space is currently scarce in their data center. They have significant unused SAN attached disk. In addition to the Advanced POWER Virtualization feature, which of the following is the minimum recommended configuration needed to meet the customer’s requirements?()
A.p5-570 6-way 1.65-GHz, 32GB
B.p5-570 8-way 1.65-GHz, 32GB
C.p5-570 6-way 1.65-GHz, 48GB
D.p5-570 8-way 1.65-GHz, 48GB -
单项选择题
Astateagencyhasrecentlydeployedanewapplicationonan8-wayp5-570thatiscriticaltotheagency’soperation.Thereisnomanualmethodtoperformthebusinessprocess.Thestategovernmenthasjustmandatedthatallstateagencieshavedisasterrecoveryplansthatallowtheagenciestorecovercriticalapplicationsinacceptableperiodsoftimewithnolossofperformance.Basedonthisnewbusinessrequirement,whatisthisagencymostlikelytoneed?()
A.HACMP and four processors for the p5-570
B.HACMP and eight processors for the p5-570
C.HACMP-XD and a 4-way p5-570 in a second location
D.HACMP-XD and a 8-way p5-570 in a second location -
单项选择题
AcustomerhasimplementedseveralIBMAIXsystemsoverthepastseveralyearsandfeelscomfortablewiththeirAIXskills.TheyareplanningtoimplementtheirfirstHACMPclusteroftwop5-570s.WhichofthefollowingshouldbeincludedintheIBMproposal?()
A.HACMP Hardware Services
B.p5-570 differences update
C.HACMP SmoothStart Services
D.AIX installation education
