单项选择题
A customer is considering multiple options for a particular set of workloads on AIX v5.2.
They need to run ten identical LPARS, each containing four fibre cards, two 2-port Ethernet cards, and one SCSI card as well as two internal boot disks.
They want the LPARS to be split across two physical systems for redundancy purposes; cost is an issue.
They need a total of approximately 40 rPerf for all ten workloads. Which of the following solutions best fits these needs?()
A.2 x p655 1.7ghz 8-way servers (21.87 rPerf each)
B.2 x p670 1.5ghz 8-way servers (24.18 rPerf each)
C.2 x p690 1.7ghz 8-way servers (27.11 rPerf each)
D.2 x p650 1.45ghz 8-way servers (18.67 rPerf each)
相关考题
-
单项选择题
Acustomerhasap650onorderandplanstoputitinacurrentOEMrack.Theyareconcernedthatthep650powersupplymaydemandmorecurrentthantheOEMPDUcanprovide.Whichplanningguidespecificationwouldprovidethenecessaryrequirements?()
A.Voltage
B.Frequency
C.Power Source Loading (max)
D.Power Source Loading (typical) -
单项选择题
AcustomerisreadytoorderapSeriessolution.However,thepSeriestechnicalspecialistisunsurewhetherthecustomerpreferredthefibrechannelortheexternalSCSIdiskattachmentoption.Whatisthemostappropriateactionforthespecialisttotakenext?()
A.Ask the customer to confirm which option is best for their environment.
B.Order the fibre channel option and purchase a converter later if necessary.
C.Order both SCSI and fibre channel adapters to cover both potential options.
D.Inform the customer that fibre channel was selected for performance reasons. -
单项选择题
A company has recently placed an order for a POWER4+ p650 server. Their facilities manager has approached the pSeries technical specialist to gather information on the correct power receptacle for thenew server. They have requested a picture of the power cord plug to show to their electrician. Where would the pSeries technical specialist find the required information?()
A.Sales Manual
B.Announcement Letter
C.POWER4+ p650 Specification Sheet
D.Site and Hardware Planning Information Manual