单项选择题
Rig ()on both side of the bow.
A. the gangway
B. the paint boards
C. the pilot ladder
D. all of the above
点击查看答案&解析
相关考题
-
单项选择题
Sufficient time should be given for each coat to ().
A.blow
B.clean
C.dry
D.wet -
单项选择题
We’ve just () our ship with one new coating.
A.washed
B.painted
C.cleaned
D.repaired -
单项选择题
Mark the joining shackles with ()paint.
A.red/yellow
B.yellow/black
C.red/white
D.yellow/red
