单项选择题
A customer is interested in obtaining an AIX solution from IBM. They have two primary global requirements:
? Availability (although HACMP is not required)
? Low cost
Which of the following approaches should the pSeries technical specialist use to meet the customer’s requirements and ensure customer satisfaction?()
A.Design the least-cost solution to prevent the competition from winning the business.
B.Design a disaster recovery (DR) solution and convince the customer why DR is important to their business.
C.Use the HACMP specialist to design the solution and include HA SmoothStart services as part of the proposal.
D.Design a solution with redundant parts and explain to the customer the incremental cost associated with the redundancy.
相关考题
-
单项选择题
ApSeriestechnicalspecialistisdesigningap5-550LPARsolutionwhichwillcontainfourlogicalpartitions.Whichtoolshouldbeusedtoensureadherencetoallpartitionrules?()
A.LVT
B.eSAR
C.eConfig
D.PCRS6000 -
单项选择题
A customer has provided the pSeries technical specialist with details of an HACMP solution that they would like validated. The solution is for two POWER4+ p630 servers directly attached to a FAStT600 storage server as the shared storage. Each system has the following: ? 2 integrated network ports ? 2 fibre channel adapter cards ? 1 power supply and redundant cooling ? HACMP v5.1 In addition to a second power supply, what further requirements, if any, are needed to validate this solution and ensure no single point of failure? ()
A.One fibre channel switch
B.Two fibre channel switches
C.Two Ethernet cards
D.Nothing -
单项选择题
Theaccountteamisputtingtogetheraverycomplexsolutionforthecustomer.Duringthesolutiondesignphase,manyofthecustomer’srequirementshavechangedandadditionalrequirementsarebeingidentified.WhatshouldthepSeriestechnicalspecialistdotoensurethegreatestpossiblecustomersatisfaction?()
A.Use eConfig to configure and validate each pSeries and p5 system.
B.Engage Advanced Technical Support to review any outstanding technical issues.
C.Confirm with the customer that the solution design meets their requirements.
D.Perform a Pre-Install Solution Assurance Review to validate required power requirements.