Which of the following should be done FIRST when setting up a new p5-520 to be managed by a new HMC via a private network?()
A.Change passwords in ASMI
B.Add the managed system to the HMC
C.Connect the p5-520 to a power source
D.Connect the HMC and the p5-520 server’s HMC1 port to the same network
相关考题
-
单项选择题
Company.com would like to share CPU resources between AIX V5.3 and Linux partitions. Which solution would best satisfy this customer requirement?()
A.Micro-Partitioning
B.Partition Load Manager
C.eWLM
D.Grid Toolbox -
单项选择题
AfterrebuildingthelistofvirtualdevicesusedbytheVIOserverusingthe"cfgdev"command,whichcommandwouldberuntoverifythatanewlyconfiguredvirtualSCSIadapterisavailable?()
A.lsdev -virtual
B.lsdev -Cs scsi
C.lscfg -vl
D.lsdev -adapter -
单项选择题
Company.com has recently received a new p5-570 in the data center and intends to Micro-Partition the server. In which order should installation steps be taken?()
A.Connect to the network,power on the server,Micro-Partition the server
B.Connect to the HMC,power on the server,Micro-Partition the server,connect to the network
C.Power on server,connect to the network,Micro-Partition the server,connect to the HMC
D.Power on the server,connect to the HMC,Micro-Partition the server,connect to the network