单项选择题
An administrator has a two node cluster, Node1 and Node2, running resource group rg1. The resource groupis active on Node1. The administrator stopped cluster services and unmanaged the resource group on Node1to work on a problem. Now the administrator needs to move rg1 to Node2. Which of the following will achievethis?()
A.Perform a clstart on Node1 with ’Manage Resource Groups’ set to ’Manually’ and select the destination ofNode2
B.Perform a resource group move operation from Node1 to Node2 and select the option to ’Re-manageResource Groups’ set to ’Automatically’
C.Perform a clstop on Node1 with option to move resource groups, this will release the resource group fromNode1 and accquire the resource group on Node2.
D.Perform a clstart on Node1 with ’Manage Resource Groups’ set to ’Automatically’, then perform a resourcegroup move operation to move rg1 from Node1 to Node2
相关考题
-
单项选择题
An administrator has integrated a new application into an existing resource group. An application server withstart and stop scripts was defined and added to the resource group definition. The cluster was thensynchronized. How can the new application be started with minimal downtime?()
A.The administrator will need to perform an rg_move operation
B.The administrator will need to un-manage and re-manage the resource group
C.The administrator will need to execute the new start script from the command line
D.The new start script will be executed as part of the DARE operation to synchronize the cluster -
单项选择题
Whichofthefollowingisrequiredtoensurethecompletionofalltestswithintheautomatedprocedureoftheclustertesttool?()
A.Application monitoring has been configured
B.Only disk heartbeat networks have been used
C.Cluster nodes are attached to two IP networks
D.Resource Group dependencies have been configured -
单项选择题
Whichofthefollowingcommandswilldisplayanyuserdefinedverificationmethods?()
A.cldump
B.clautover v
C.clve c .custom v
D.cllscustom t verify
