The en0 interface on Node1 of a two-node cluster has failed. This adapter is configured with a boot addressand under stable operations also has the service address of the cluster’s single resource group. The resourcegroup is configured with the fallback option. The HA network was configured for IPAT via aliasing and now theservice address is on the en1 interface in the cluster. The en0 interface has already been physically replacedand configured with the boot address. Which of the following will return the cluster to its original state andminimize cluster downtime?()
A.Run cluster synchronization.
B.Restart cluster services on Node1.
C.Perform a swap_adapter using C-SPOC
D.Restart cluster services on both nodes
相关考题
-
单项选择题
Anadministratorhasatwonodecluster,Node1andNode2,runningresourcegrouprg1.TheresourcegroupisactiveonNode1.TheadministratorstoppedclusterservicesandunmanagedtheresourcegrouponNode1toworkonaproblem.Nowtheadministratorneedstomoverg1toNode2.Whichofthefollowingwillachievethis?()
A.Perform a clstart on Node1 with ’Manage Resource Groups’ set to ’Manually’ and select the destination ofNode2
B.Perform a resource group move operation from Node1 to Node2 and select the option to ’Re-manageResource Groups’ set to ’Automatically’
C.Perform a clstop on Node1 with option to move resource groups, this will release the resource group fromNode1 and accquire the resource group on Node2.
D.Perform a clstart on Node1 with ’Manage Resource Groups’ set to ’Automatically’, then perform a resourcegroup move operation to move rg1 from Node1 to Node2 -
单项选择题
An administrator has integrated a new application into an existing resource group. An application server withstart and stop scripts was defined and added to the resource group definition. The cluster was thensynchronized. How can the new application be started with minimal downtime?()
A.The administrator will need to perform an rg_move operation
B.The administrator will need to un-manage and re-manage the resource group
C.The administrator will need to execute the new start script from the command line
D.The new start script will be executed as part of the DARE operation to synchronize the cluster -
单项选择题
Whichofthefollowingisrequiredtoensurethecompletionofalltestswithintheautomatedprocedureoftheclustertesttool?()
A.Application monitoring has been configured
B.Only disk heartbeat networks have been used
C.Cluster nodes are attached to two IP networks
D.Resource Group dependencies have been configured