单项选择题
A customer is getting ready to install a new pSeries system into their data center. They are concerned about providing the appropriate clearance around their 7014-T42 to allow for maintenance. What reference material should the pSeries technical specialist provide to the customer?()
A.Sales Manual
B.Announcement Letter
C.Site and Hardware Planning Information
D.Adapter, Devices, and Cable Information for Multiple Bus Systems
点击查看答案
相关考题
-
单项选择题
Acustomerhasan8-wayp5-570witheightinternaldiskdrivesandAIX5.2.Whichofthefollowingmustbeadded,ifanything,totheconfigurationtosupportfourLPARs,assumingeachLPARrequirestwodiskdrives?()
A.7311-D20 drawer with four disks
B.Upgrade to AIX 5.3
C.Fiber adapters to attach to SAN
D.Nothing -
单项选择题
A customer is considering multiple options for a particular set of workloads on AIX v5.2. They need to run ten identical LPARS, each containing four fibre cards, two 2-port Ethernet cards, and one SCSI card as well as two internal boot disks. They want the LPARS to be split across two physical systems for redundancy purposes; cost is an issue. They need a total of approximately 40 rPerf for all ten workloads. Which of the following solutions best fits these needs?()
A.2 x p655 1.7ghz 8-way servers (21.87 rPerf each)
B.2 x p670 1.5ghz 8-way servers (24.18 rPerf each)
C.2 x p690 1.7ghz 8-way servers (27.11 rPerf each)
D.2 x p650 1.45ghz 8-way servers (18.67 rPerf each) -
单项选择题
Acustomerhasap650onorderandplanstoputitinacurrentOEMrack.Theyareconcernedthatthep650powersupplymaydemandmorecurrentthantheOEMPDUcanprovide.Whichplanningguidespecificationwouldprovidethenecessaryrequirements?()
A.Voltage
B.Frequency
C.Power Source Loading (max)
D.Power Source Loading (typical)