单项选择题
An IBM System x Technical Expert has a prospective customer who is very excited about X5 and they are working on configurations. During the process the customer has changed the design numerous times and has significantly increased the scope. They recently selected a Business Partner who has been involved in the last few design changes. What steps should be taken to make sure the customer is satisfied with the solution?()
A.Turn over current design to Techline to create configurations
B.Perform knowledge transfer of design requirements to Business Partner then disengage
C.Work with business partner to engage Techline to assist with configurations and request Technical and Delivery Assessment (TDA)
D.Work with business partner to engage Techline to create configurations
相关考题
-
单项选择题
AbankingcustomerhastwoEthernetSwitchModulesinstalledinanIBMBCEchassis.Themoduleswereconfiguredidentically.TheEthernetmoduleinbay1wasaccidentallyresettofactorydefaults.Whichsolutionreturnsthemoduletothecustomer-specificconfiguration?()
A.Restore the configuration from NVRAM using the Switch Module Web interface
B.Back up the configuration of the Ethernet module in bay 1 and restore it to the Ethernet module in bay 2 using the AMM
C.Swap the modules, which will automatically resynch the settings stored in the Advanced Management Module
D.Back up the configuration from Ethernet module in bay 2 and restore it to the module in Bay 1 using the switch CLI or Web interface -
单项选择题
AninsurancecustomerinstallstwoBladeCenterchassisinarackwithglassdoors.Afterashorttime,theblowersinbothBladeCentersincreasetofullspeed,andthenonefails.Apartfromreplacingthebrokenblower,whichadditionalactionisrequiredforalongtermfix?()
A.Add Rear Door Heat eXchanger
B.Add fans to the top of the racks
C.Increase circulation from Data Center raised floor
D.Change to perforated doors -
单项选择题
HowmanyBladeCenterHTchassiswillfitinastandard19"42Urack?()
A.2.
B.3
C.4
D.6
