单项选择题
A customer is adding a new p5 machine to their environment. The machine will host several DB2 partitions running AIX 5.2. They currently have two SAN directors and an IBM ESS. The SAN design allows for concurrent maintenance. What is required on each partition to attach to the SAN?()
A.A minimum of two HBAs; the customer will need to download SDD
B.A minimum of four HBAs; the customer will need to download SDD
C.A minimum of two HBAs; the customer will need to configure MPIO
D.A minimum of four HBAs; the customer will need to configure MPIO
相关考题
-
单项选择题
AcustomerhasseveralsmallAIXapplicationsthatareexpectedtogrowoverthenextseveralyears.ThebiggestchallengefacingthecustomerisdeterminingthegrowthrateoftheapplicationsandtheI/Trequirementsneededtosupportthegrowth.Theyarealsoconcernedabouttheunder-utilizationoftheirITresources.WhatshouldthepSeriestechnicalspecialistrecommendtoaddressthischallenge?()
A、Install a p615 per application.
B、Install a p650 with AIX 5.2 and dynamic LPAR and CUoD.
C、Install the appropriate solution once the requirements are understood.
D、Install a POWER5 system with AIX 5.3, Advanced POWER Virtualization, and CoD. -
单项选择题
A customer has asked for a p690 system with the following requirements: ? 32 1.9ghz processors ? 128GB of memory ? 20 fiber adapters ? 7 network cards ? 10 LPARs What is the most appropriate question to ask them in order to build the hardware configuration correctly?()
A.What version of AIX is needed?
B.Which SWMA offering is needed?
C.What kind of network is the system being attached to?
D.What kind of memory should be configured on the system? -
单项选择题
Acustomerisorderinganewp650servertobeplacedintoanexistingOEM42U19-inchrackcontainingonlytwop630servers.Thisisthefirstp650intheenterprise.Whatisthemostimportant questionthatthepSeriestechnicalspecialistshouldaskthecustomerbeforetheorderisplaced?()
A.Have the PDU requirements been met?
B.Are there sufficient KVM connections?
C.Is there sufficient service clearance?
D.Is there sufficient space in the existing rack?
